Fournil Albâtre, the full simulation.
An industrial bakery delivering every morning to supermarkets and canteens. The case followed on this page, the night before a bank holiday weekend.
An industrial bakery delivering every morning to supermarkets and canteens.
The night schedule is ready before the first mixer starts.
- Fournil Albâtre employs one hundred and eighty people near Rennes. Every night, it bakes bread and pastries for regional supermarkets and canteens.
- Orders arrive through multiple channels with last-minute changes, and the production manager redraws the schedule by hand every evening. Retailers demand product and allergen data sheets that take weeks to compile.
- An agent consolidates orders from all channels and flags variances compared to the previous day. Every evening, the production manager receives a proposed schedule for the night.
What remains with the teams
The production manager validates the schedule before the first mixer starts, and the agent never modifies an order without store approval.
- Orders entered without errors
- Out-of-stock incidents in stores
- Variances confirmed before baking
- Time spent on scheduling
Product and allergen data sheets
The product sheets requested by retail chains are drafted from validated recipes, in each retailer's required format.
Quality assurance checks and signs off each allergen sheet, as an error directly affects consumer health.
Sales forecasting
Weather data and each store's history are used to suggest quantities for the following day.
Each store retains control over its order.
Oven monitoring
Oven temperatures and cycles are monitored continuously, and the agent flags any drift before a breakdown occurs.
Technicians decide on every oven shutdown.
Food safety management plan
Temperature and cleaning logs are recorded on tablets, and the agent identifies missing logs before an audit.
The quality manager signs off the file before each audit.
the night before a bank holiday weekend
The night before a bank holiday weekend, before and after.
- Orders
- They arrive via multiple channels, with last-minute changes.
- The agent collates orders from all channels and flags variances against the previous day.
- First workstream
- The night schedule
- The head of production rebuilds it manually every evening.
- They receive a proposed schedule each evening, which they approve before the first dough mixing.
- First workstream
- Bank holiday volumes
- On the eve of a bank holiday weekend, volumes are decided by guesswork.
- Weather data and each store's history are used to suggest volumes, and each store retains control over its order.
- Workstream 3
- Product specification sheets
- A retail chain waits weeks for its allergen sheet.
- Sheets are drafted from approved recipes, and quality signs off each allergen sheet.
- Workstream 2
- Ovens
- A breakdown is discovered in the middle of the night.
- Temperatures and cycles are tracked, and the agent flags any drift before a breakdown occurs.
- Workstream 4
- The audit
- Missing logs are discovered on the eve of the audit.
- Logs are moved to tablets, and the agent spots missing entries in time.
- Workstream 5
- Collate orders
- It reads retailer portals, emails, canteen spreadsheets, and logged calls.
- Flag variances
- It compares each order to the previous day and to the same week last year.
- The store confirms any modification.
- Propose the schedule
- It proposes the processing order for doughs and ovens for the night.
- The head of production approves it before the first dough mixing.
- Forecast volumes
- It suggests next-day volumes to each store, based on weather and history.
- Draft specification sheets
- It drafts product specification sheets from approved recipes.
- Quality signs off each allergen sheet.
- Monitor ovens
- It tracks temperatures and cycles, and flags any drift.
- Technicians decide on every stoppage.
- Track logs
- It identifies missing temperature and cleaning records.
- Prepare the audit
- It gathers logs and specification sheets for the quality manager.
- The quality manager signs off the file.
- Retailer ordering portals
- Supermarket orders.
- Read only
- Production software
- Recipes and production schedules.
- Proposed schedule, approved by the head of production
- Oven sensors
- Continuous temperatures and cycles.
- Read only
- Logging tablets
- Temperature and cleaning logs.
- Read and alerts
- Product sheet database
- Approved recipes and sheets formatted for each retailer.
- Drafts, signed off by quality
- Head of production
- Approves each night's schedule.
- Quality manager
- Signs off each allergen sheet and the audit file.
- Maintenance technicians
- Decide on every oven stoppage.
- Sales administration
- Confirms every order modification with stores.
- The FDE
- Leads the engagement and is accountable for every agent.
- Order agent
- Collates orders and flags variances.
- Planning agent
- Proposes the schedule and volumes.
- Quality agent
- Drafts sheets and tracks logs.
- Maintenance agent
- Monitors ovens and flags drifts.
- An order is modified without agreement.
- The agent flags variances without modifying anything, and the store confirms every change.
- The schedule overlooks a constraint.
- The head of production approves each schedule, and their corrections refine the agent's rules.
- An allergen sheet contains an error.
- European regulations require 14 allergens to be highlighted on packaging. Quality checks and signs off each sheet, as an error affects consumer health.
- The forecast misses a specific day.
- A study conducted on a bakery chain specifically addresses these days, when demand differs from regular days. Each store retains control over its order.
- An oven is stopped by mistake.
- The agent flags a drift, and only technicians decide on a stoppage.
- We measure the baseline over a quarter, including data entry errors, store stockouts, discrepancies found after baking, and time spent on scheduling. The head of production outlines their rules.
- The agent collates orders in parallel with regular data entry, and we compare results each morning.
- Data entry transfers to the agent, and the proposed schedule arrives each evening alongside the head of production's version.
- The head of production works from the proposal. We compare against the baseline and prepare the product sheets.
- Orders entered without error
- Errors identified by sales administration, weekly.
- Store stockouts
- Stockouts reported by stores, product by product.
- Variances confirmed before baking
- Variances flagged by the agent and confirmed by stores before the first dough mixing.
- Time spent on scheduling
- Time logged by the head of production, each evening.