Atelier Écoinçon, the full simulation.

An architectural practice where planning applications and meeting minutes eat into design time. The case followed on this page, planning permission for a house of over 150 m² in Marcq-en-Barœul, where an architect is mandatory.

An architectural practice where planning applications and meeting minutes eat into design time.

More time to design, less time for paperwork.

What remains with the architects

The architect remains the project designer and signs every submission. The agent draws no plans and makes no technical or regulatory determinations.

Plot planning constraints

For each plot, the agent collates the local planning regulations and easements, then prepares a constraints summary sheet.

The architect interprets each rule and verifies it with the planning authority where necessary.

Tender documentation

The agent compiles the written documents from the studio's specifications and checks consistency across packages.

The architect reviews and signs off each document, and the agent does not select any contractor.

Contractor queries during construction

Each query is routed into a single queue alongside the relevant drawings, and the agent suggests a response drawn from the contract documents.

The architect approves each response, and any modification to the design must go through them.

Practical completion and handover

The agent prepares pre-handover inspections and monitors snagging resolution. Finally, it compiles the closeout file delivered to the client.

The client signs off on handover, advised by the architect.

planning permission for a house of over 150 m² in Marcq-en-Barœul, where an architect is mandatory

A house planning application in Marcq-en-Barœul, before and after.