Chevêtre Bâtiment, the full simulation.
A structural works and renovation contractor whose site managers finish their site reports after dark. The case followed on this page, the renovation of a twelve-flat building in Neudorf.
A structural works and renovation contractor whose site managers finish their site reports after dark.
The site report is sent the same evening, without an hour of data entry.
- Chevêtre Bâtiment employs sixty-five people near Strasbourg. The company builds multi-family housing and renovates houses and buildings for developers and private individuals alike.
- Site managers spend their days on site and their evenings typing up reports and ordering for the following day. Renovation quotes wait for weeks, and some clients sign elsewhere in the meantime.
- On site, the site manager dictates observations and takes photos. The agent produces the report, complete with action items for each contractor, and prepares the orders to be placed.
- The manager reviews everything on their phone before sending, and each report is saved in the construction project folder.
What remains with the teams
The site manager signs each report and approves every order. Site safety remains with site supervisory staff, and the agent does not alter any method statement.
- Report turnaround time
- Weekly data entry time
- Orders delivered on schedule
- Snags at practical completion
Renovation quotes
After the technical visit, the agent prepares the quote using on-site measurements and the company's price library.
The business manager checks each quantity and sets the final price.
Scheduling and deliveries
Progress reports and expected deliveries update the schedule for each workstream. The agent flags a delayed delivery before it halts a team.
The site manager arbitrates between workstreams.
Handover and as-built documentation
The agent prepares handover operations and tracks the clearing of each snag. It then compiles the as-built documentation and, for residential properties, the documents for the property information file.
The site manager signs the handover certificate with the client.
Defects liability period
During the year following handover, every client issue reported is logged, then assigned to a team within the agreed timeframe.
The technical manager alone decides which warranty applies.
the renovation of a twelve-flat building in Neudorf
Twelve flats renovated in Neudorf, before and after.
- The site meeting
- The contracts manager takes notes in a notepad, then types up the minutes in the evening.
- He dictates his observations on site and takes photos. The agent prepares the minutes, which he reviews on his phone.
- First workstream
- Actions
- Each contractor takes away what they want from the meeting.
- The minutes list each contractor's actions, and the agent sends reminders before the next meeting.
- First workstream
- Orders
- Orders are placed by phone, and an overlooked delivery halts a team.
- The agent drafts orders based on the minutes, and the contracts manager approves them.
- First workstream
- The schedule
- It lives inside the contracts manager's head.
- The agent updates the schedule based on minutes and deliveries, then flags upcoming delays.
- Workstream 3
- Handover
- Snags are noted on paper, and the as-built documentation is scrambled together at the last minute.
- The agent prepares the handover, then tracks the resolution of each snag through to the as-built documentation.
- Workstream 4
- After handover
- Reports from occupants arrive by email, with no clear follow-up.
- Each report is logged and assigned to a team, with the agreed deadline.
- Workstream 5
- Listen to dictation
- On site, it transcribes the contracts manager's dictation and organises photos by zone.
- Draft the minutes
- It formats observations and decisions into the company template, including outstanding items.
- The contracts manager reviews and signs off each set of minutes.
- List actions
- It assigns each action to a contractor or team, with its deadline.
- Prepare orders
- It prepares material orders based on the minutes and known stock levels.
- The contracts manager approves each order.
- Distribute
- It sends the approved minutes to contractors and the project manager.
- Follow up
- Before the next meeting, it reminds everyone of remaining open actions.
- Flag a risk
- Any observation relating to safety is sent immediately to management, without waiting for the minutes.
- Management decides on safety measures.
- Archive
- Each set of minutes is added to the site file, along with its photos.
- The contracts manager's phone
- Dictation and photos taken on site.
- Receiving dictation and photos
- Site management software
- Sites, schedules, minutes and documents.
- Draft creation and document filing
- Material suppliers
- Orders and delivery receipts.
- Order preparation, dispatch approved by the contracts manager
- Company email
- Distribution of minutes to contractors and the project manager.
- Sending approved documents
- Estimating and billing software
- Company price database and invoices.
- Reading the database, drafting estimates
- Contracts managers
- Dictate minutes and approve orders.
- Site supervisors
- Report team requirements and safety issues.
- The commercial manager
- Checks estimates and sets pricing.
- Leadership
- Sets rules and is accountable for site safety.
- The FDE
- Leads the engagement on the ground and is accountable for each agent.
- Minutes agent
- Transcribes dictation and drafts minutes.
- Procurement agent
- Prepares orders and tracks deliveries.
- Scheduling agent
- Updates the schedule and flags delays.
- Monitoring agent
- Spots discrepancies between minutes and orders, and flags them to the FDE.
- The minutes misrepresent a decision.
- The contracts manager reviews and signs off each set of minutes before distribution, and the original dictation remains attached to the file.
- An incorrect order is placed.
- No order is placed without approval from the contracts manager, including quantities.
- A safety issue gets lost in the minutes.
- Any safety observation is sent immediately to management, along with its photo, and the agent does not alter any operating procedure.
- Teams feel monitored.
- The agent does not score or rate any individual. The ethics charter published by the FFB requires informing employees and clients about AI use, and we adhere to it.
- Client plans and data are leaked.
- Named access, logging of every action and data hosted in Europe.
- We measure the baseline over one quarter, such as turnaround time for sending minutes, reported entry time, late-delivered orders and snags at handover. Contracts managers validate the minutes template with us.
- A volunteer contracts manager dictates on a pilot site, and we refine the minutes alongside him.
- Two other sites transition to the agent, including orders.
- All ongoing sites transition to the agent. We compare against the baseline and select the next workstream with management, often renovation estimates.
- Turnaround time for minutes
- Time between the end of the meeting and distribution of the minutes, tracked in the site software.
- Entry time per week
- Time reported by contracts managers, before and during the engagement.
- Orders delivered on the scheduled date
- Proportion of deliveries arriving on the requested date, recorded from supplier delivery notes.
- Snags at handover
- Number of snags per flat at handover, compared to previous projects.