Tuyere, the full simulation.
A young company 3D-printing metal aerospace components whose engineers spend more time compiling First Article Inspection Reports than operating additive manufacturing machines. The case followed on this page, a business jet duct bracket, printed for the first time.
A young company 3D-printing metal aerospace components whose engineers spend more time compiling First Article Inspection Reports than operating additive manufacturing machines.
Every First Article Inspection Report ready the moment the part leaves inspection.
- Tuyere manufactures metal brackets and ducting for aerospace systems suppliers. Two former aircraft manufacturer engineers founded the company in Wichita, known as the air capital of the world. It employs thirty people and operates four metal additive manufacturing systems.
- Every new part requires a First Article Inspection according to AS9102, whose Revision C dates from June 2023. Quality engineers manually complete the standard's three forms, transcribing every dimension from the drawing alongside powder batch and heat treatment certificates.
- A single report takes several days, leaving finished components awaiting dispatch on workshop shelves. In addition, certain client drawings fall under US export controls and cannot be stored or processed without strict data handling restrictions.
- An agent balloons drawing characteristics and maps measurement outputs from the inspection machine dimension by dimension against specified tolerances. It fills in the standardised forms and attaches corresponding powder and heat treatment documentation.
- It flags any out-of-tolerance dimension and missing data points. The quality engineer evaluates each discrepancy and signs off the report.
What remains with the quality engineers
The quality engineer adjudicates every non-conformance and signs every report. Technical drawings subject to export controls stay on US-based servers with end-to-end encryption, accessible only to authorised personnel.
- Turnaround time from inspection completion to signed report
- Reports rejected by the customer
- Omitted dimensions identified during review
- Components awaiting documentation sign-off
Certificates of conformity
For each delivery, the agent prepares the certificate of conformity from the manufacturing record and batch numbers.
The quality engineer signs each certificate.
Additive build monitoring
The printers record each layer. The agent detects anomalies in an ongoing print and alerts the operator.
The operator decides whether to stop or continue the print, and the engineer decides the fate of the part.
Responses to requests for quote
Equipment manufacturers send tenders with their quality requirements. The agent identifies each client's requirements and prepares the response pack.
The founders decide whether to respond and set the price.
Quality audit management
Before each audit, the agent gathers the evidence required by the aerospace quality standard, procedure by procedure.
The quality manager prepares the audit and answers the auditor alone.
a business jet duct bracket, printed for the first time
The first bracket printed for a new client, before and after.
- The drawing
- The quality engineer manually balloons each characteristic on the drawing.
- The agent balloons the characteristics and extracts each dimension with its tolerance.
- First workstream
- Measurements
- Inspection machine readings are copied across dimension by dimension.
- The agent matches each measurement to its dimension.
- First workstream
- Certificates
- Powder and treatment certificates are retrieved from multiple folders.
- The agent attaches the certificates to the report using batch numbers.
- First workstream
- The deviation
- An out-of-tolerance dimension goes unnoticed, and the client rejects the report.
- The agent flags the out-of-tolerance dimension, and the quality engineer decides before signing.
- First workstream
- Delivery
- The certificate of conformity is drafted manually the day before dispatch.
- The agent prepares the certificate from the manufacturing record.
- Workstream 2
- The next print
- A print defect only appears during inspection, after hours of machine time.
- The agent detects the anomaly during printing and alerts the operator.
- Workstream 3
- Read the drawing
- It balloons each characteristic on the drawing and extracts its dimension and tolerance.
- Match measurements
- It matches the inspection machine measurement to each dimension.
- Attach certificates
- It attaches powder and treatment certificates using batch numbers.
- Complete forms
- It fills in the three forms of the AS9102 standard.
- Flag issues
- It flags every out-of-tolerance dimension and missing measurement.
- The quality engineer decides on each deviation.
- Submit for signature
- It submits the complete report to the quality engineer.
- The quality engineer signs each report.
- Archive
- It archives the signed report alongside the part record.
- Report progress
- It prepares a weekly update on pending reports and recorded deviations.
- Client drawings
- Part drawings and models, some of which are subject to export controls.
- Read-only, on US servers
- Inspection machine
- Measurements for each part.
- Read-only
- Manufacturing record
- Powder batch numbers and applied treatments.
- Read-only
- Quality management system
- First article inspection reports and certificates.
- Report preparation, signature by the engineer
- Printer data
- Logs for each build, layer by layer.
- Read-only
- The founders
- Set the agent rules with us and select the next workstream.
- Quality engineers
- Decide on each deviation and sign off every report.
- Operators
- Start print runs and decide whether to abort a questionable build.
- Export control manager
- Designates who is authorised to view each drawing.
- The FDE
- Leads the engagement and writes the agent rules with the team. Accountable for every agent.
- Drawing reader agent
- Balloons characteristics and extracts dimensions.
- Reporting agent
- Matches measurements and completes forms.
- Print monitoring agent
- Reads printer logs and flags anomalies.
- Audit agent
- Compares a sample of reports against drawings and flags any missed dimension to the FDE.
- The agent misses a dimension.
- The audit agent compares each report against the drawing, and the quality engineer reviews it before signing.
- An out-of-tolerance dimension passes unnoticed.
- The agent flags every deviation, and only the quality engineer decides.
- A drawing leaves the United States.
- Drawings subject to export controls remain on US servers, end-to-end encrypted, and only authorised individuals can access them.
- A certificate does not match the batch.
- The agent starts from batch numbers in the manufacturing record and flags any inconsistency.
- A report is sent without a signature.
- No report leaves the business without the quality engineer's signature.
- We establish the baseline over one month, covering the time from inspection to signed report, rejected reports, missed dimensions and parts on hold. The export control manager works with us to designate authorised personnel.
- The agent prepares reports in parallel with the engineers for two weeks, and we compare its files against theirs.
- Quality engineers use the agent's reports as the baseline for all new parts.
- We compare against the baseline and select the next workstream with the founders.
- Time between end of inspection and signed report
- Time elapsed between the final measurement and signature, recorded in the quality system.
- Reports rejected by the client
- Reports returned by clients, compared against the baseline month.
- Missed dimensions identified during review
- Dimensions omitted from the report identified by the engineer or the audit agent.
- Parts awaiting documentation
- Inspected parts awaiting their report, recorded every Friday.