Energy and resources, six simulated engagements.
Six companies with fictional names, across Europe and the United States, from the project of a former water technician to the electricity supplier now purchasing everything on the wholesale market. In each simulation, AI forecasts, sorts, reconciles, and prepares. Decisions remain with the teams, from power procurement to signing off on sustainability records.
These simulations illustrate our method using representative cases. The companies and their exchanges are fictional.
What AI is already changing, from forecasting to the grid.
of electricity projected to be consumed by data centres worldwide in 2030 according to the IEA, more than double the 2024 level.
or more was the median time between an interconnection request and commercial operation for US power plants completed in 2025.
companies were waiting in the Netherlands, in December 2025, for a new or upgraded connection to the electricity grid.
of treated drinking water went unbilled in Portugal in 2024, amounting to approximately 190 million cubic metres.
Since 11 October 2026, European companies consuming more than 10 TJ of energy per year have been required to have completed an energy audit, unless they operate an energy management system. Above 85 TJ, this certified system becomes mandatory on 11 October 2027.
Six companies, six starting points.
A green electricity supplier now buying all its energy on the wholesale market, with consumption forecasts still run on spreadsheets.
Every morning, a consumption forecast that the procurement team can defend.
- Bief supplies renewable electricity to households and businesses across France from its headquarters in Grenoble. The company employs ninety people, including a five-person procurement team that buys power from generators and on the wholesale market.
- Until the end of 2025, part of the electricity sold by Bief came from ARENH, the mechanism granting access to EDF nuclear generation at a regulated price. It ended on 31 December 2025, and suppliers must now source entirely on wholesale markets or from their own generation assets.
- Consumption forecasting is handled in a spreadsheet using historical data and weather forecasts. When it is inaccurate, Bief incurs imbalance charges for the difference between what it procured and what its customers consumed, without being able to identify the source of the error the following day.
- Each morning, an agent prepares the consumption forecast for the coming days, customer by customer for large commercial accounts and by profile for households. It cross-references consumption history, weather forecasts, public holiday calendars, and customers joining or leaving.
- It also accounts for each variance from the previous day, such as colder weather than forecast or a client factory shutdown. The procurement team then determines the purchases and sales for the day.
What remains with the procurement team
The head of procurement decides on every purchase and sale, within the risk limits set by management. The agent places no market orders.
- Variance between forecast and actual consumption
- Variances explained the following day
- Time spent preparing the forecast
- Large accounts forecast individually
A solar maintenance firm whose crews chase hundreds of alarms daily in record heat.
Every alarm sorted before crews depart, the most costly first.
- Tailrace operates and maintains around sixty solar plants in Arizona and Nevada on behalf of asset owners, from warehouse rooftops to utility-scale ground-mounted facilities. The Phoenix-based company employs one hundred and ten people, including seventy technicians organised into regional crews.
- Every morning, the control centre receives hundreds of alarms from inverters, combiner boxes, trackers, and meters. Supervisors triage them manually, and a crew sometimes sets off to fix a minor fault while an entire inverter sits idle elsewhere.
- Across plants analysed in 2024 by a global industry report, inverters accounted for 37% of lost power. Extreme heat compounds every issue, and Phoenix recorded 70 days at 110 °F (43 °C) or above in 2024, an all-time record.
- An agent triages overnight alarms from six in the morning. It clusters those stemming from the same root fault and estimates the energy loss for each. It then suggests a dispatch schedule per crew, complete with the spare parts required.
- For every dispatch, it prepares the technician's job sheet with equipment service history and the manufacturer's procedure. The supervisor approves the schedule, and the technician files the field report on site.
What remains with the teams
The supervisor decides on every dispatch and its priority. On site, the technician alone assesses whether work can proceed safely, whether in extreme heat or on live equipment.
- Energy lost prior to intervention
- Time elapsed between alarm and intervention
- Wasted callouts
- First-time fix rate
A group of four anaerobic digestion units injecting biomethane into the gas grid, compiling sustainability compliance records by hand ahead of each audit.
Every delivery traced, from farm to grid injection.
- Fluder operates four anaerobic digestion plants around Oldenburg, in Lower Saxony. They convert livestock manure and crop residues into biogas, upgraded to biomethane and injected into the gas grid. The group employs fifty-five people and partners with over two hundred farms.
- In Germany, 268 facilities were injecting biomethane into the grid in 2025, reaching a record 12.3 TWh. Above 200 Nm³ per hour, a plant must prove the sustainability of its biomethane under the European Renewable Energy Directive, meeting specific emission reduction thresholds.
- At Fluder, delivery notes, weighbridge tickets, laboratory assays, and injection logs are reconciled by hand ahead of each audit. Offtakers require sustainability documentation for every batch delivered.
- An agent compiles delivery notes and weighbridge slips daily, matching them to source farms. It maintains the mass balance for each plant and calculates greenhouse gas emissions using the values specified in the directive.
- It flags any undocumented delivery and any feedstock outside the approved specification. Prior to the audit, it compiles the evidence pack, plant by plant.
What remains with managers
The quality manager signs off on every sustainability declaration, and the certification body's auditor remains the sole authority on certification. The agent alters no weighbridge data or lab analyses.
- Deliveries traced back to the source farm
- Missing documents flagged before audit
- Audit preparation time
- Non-conformities raised by the auditor
An early-stage company developing community solar gardens and storage batteries, whose interconnection filings lag behind construction schedules.
Every interconnection filing complete ahead of deadline.
- Leat was founded by two former grid operator engineers. The Minneapolis-based company develops community solar gardens, which local residents subscribe to in order to lower electricity bills, alongside grid-connected batteries. It employs eighteen people with around twenty projects under development across Minnesota.
- Every project requires an interconnection application with the grid operator, involving engineering studies and strict milestones. In the United States, the median time between application and commercial operation was over five years for plants completed in 2025.
- Following a 2023 statute, new Minnesota community solar gardens fall under a state Department of Commerce programme reserving at least 30% of each garden for low- to moderate-income households. The two founders spend their evenings tracking deadlines across spreadsheets.
- An agent tracks each interconnection application from initial filing to agreement, managing deadlines and utility inquiries. It reviews technical studies as they arrive and summarises required network upgrades for the engineering team.
- Ahead of each milestone, it compiles required submittal documents and flags missing items. The lead engineer reviews every document and signs off on every submission.
What remains with the engineers
Engineers sign every formal application and response to the utility, and the founders decide whether to advance or drop a project following each study. The agent submits nothing on its own.
- Deadlines met
- Applications complete on first submission
- Response time to utility inquiries
- Engineer time spent on administrative filings
A young advisory firm helping industrial firms benchmark electricity contracts and corporate PPAs, whose consultants spend entire days parsing legal terms.
Every contract reviewed clause by clause before negotiation.
- Wipmolen was founded by a former energy procurement manager from a chemicals group. The Rotterdam-based consultancy advises mid-sized industrial manufacturers procuring electricity and gas and increasingly entering into long-term renewable power purchase agreements (PPAs). It employs fourteen people, including nine consultants.
- An industrial electricity contract typically spans dozens of pages of clauses covering volume tolerance, flexibility, indexation, and termination. Consultants parse them manually for each client and proposal, comparing contracts structured around entirely different formats.
- In the Netherlands, 14,000 businesses were waiting for a new or upgraded grid connection in December 2025. In April 2026, the European Commission recommended that Member States remove barriers to corporate power purchase agreements.
- An agent parses each supply agreement and proposal, mapping clauses into a standardised matrix alongside exact page references. It highlights unusual provisions, such as punitive take-or-pay penalties or restrictive early termination conditions.
- For power purchase agreements, it benchmarks the expected generation profile against site-level consumption. The consultant structures the recommendation, and the client leads supplier negotiations.
What remains with consultants and clients
Consultants draft every advisory note, and the client alone decides whether to sign. Client legal counsel approves all clauses, and the agent contacts no suppliers.
- Contract review time
- Atypical clauses identified before negotiation
- Proposals benchmarked per client
- Questions raised by legal counsel after the recommendation
A former water utility technician seeking to help small municipalities pinpoint leaks, starting out without an existing customer base.
A value proposition tested against water utilities before the first pitch.
- Açude is the venture of a former municipal water technician from the Alentejo region. She aims to provide small water utilities with an analytics tool identifying network leaks using district metered areas and night-flow measurements when baseline demand drops.
- In Portugal, 27% of treated drinking water went unbilled in 2024, according to the national water regulator. Small distribution networks lack the staff to locate leaks, and district meters often sit unread.
- The European Drinking Water Directive required Member States to assess leakage across large distribution systems by 12 January 2026, with the European Commission set to establish a threshold by January 2028. For now, the venture exists as a concept and a contact list.
- Within days, the concept is turned into an online prototype featuring fictional district metered areas and night flows for a small network. Ahead of any sales meeting, the proposition is stress-tested against a simulated buyer panel mimicking municipal heads and private concession operators.
- The panel raises two core objections: municipal bodies purchase through public tenders with no budget for additional software, and all stakeholders require proof on a live network before committing funds. The offering pivots to a six-month pilot with a concession operator, paid according to the leaks located.
What remains with the founder
A simulated buyer never pays, and proof requires a signed pilot on an active distribution network. The founder leads every commercial meeting, and only network field technicians decide whether to excavate for repairs.
- Value proposition iterations tested with the panel
- Water utilities met with
- Pilots secured
- Field-confirmed leaks
Every call prepared, then analysed by AI
No case study has been published for this sector yet. The APPELIA case study explains how every sales call is prepared, then analysed with AI. It is categorised under the Technology and innovation sector.