Fluder, the full simulation.

A group of four anaerobic digestion units injecting biomethane into the gas grid, compiling sustainability compliance records by hand ahead of each audit. The case followed on this page, a straw delivery arrived without a weighbridge ticket at unit 3, three weeks before the audit.

A group of four anaerobic digestion units injecting biomethane into the gas grid, compiling sustainability compliance records by hand ahead of each audit.

Every delivery traced, from farm to grid injection.

What remains with managers

The quality manager signs off on every sustainability declaration, and the certification body's auditor remains the sole authority on certification. The agent alters no weighbridge data or lab analyses.

Digester monitoring

Digesters record their temperature and gas production. The agent identifies deviations signalling a drop in production and alerts the plant operator.

The plant operator decides on each ration change.

Farm supply contracts

The agent compares, contract by contract, the volumes committed by each farm against actual deliveries.

The purchasing manager negotiates each contract.

Digestate spreading plans

Digestate returns to the fields as fertiliser. The agent prepares spreading plans and declarations based on analyses and surface areas.

The agronomist validates each plan.

Sales to industrial offtakers

The agent prepares the documentation pack accompanying the delivered biomethane for each buyer.

The commercial director negotiates each sales contract.

a straw delivery arrived without a weighbridge ticket at unit 3, three weeks before the audit

A delivery without a weighbridge ticket before the audit, before and after.

dena, biomethane injection in Germany in 2025

dena, what the RED III Directive requires for biomethane