Épissure, the full simulation.
An operator running a rural county's public fibre network, discovering connection defects only when subscribers lose service. The case followed on this page, a connection in the street cabinet in Saint-Junien, on a Tuesday in November, with a fibre routed outside its path.
An operator running a rural county's public fibre network, discovering connection defects only when subscribers lose service.
Every connection inspected that evening, supported by photographic evidence.
- Épissure operates the public fibre-optic network and its approximately one hundred thousand connections on behalf of a rural French county. Based in Limoges, the business employs one hundred and twenty staff. Subscriber connections are handled by technicians from retail service providers, who frequently rely on subcontractors.
- At the end of June 2026, 85% of fixed internet subscriptions in France were delivered via fibre. Every new Épissure subscriber is connected by a technician from their chosen provider, working directly inside street distribution cabinets.
- Technicians submit photos of each job, but no one has the time to review them. A cable poorly routed in a cabinet can disconnect a neighbouring subscriber weeks down the line. Regulatory authority Arcep tracks the proportion of defects rectified within 30 days, which reached 88% in February 2026 across all retail operators.
- Every evening, an agent reviews before-and-after photos of the day's field work on street cabinets and building termination boxes. It identifies misplaced fibres, missing labels, omitted protective caps, and enclosures left open.
- For each defect, it drafts an incident report for the relevant operator with photos attached, tracking the remediation through to the submission of a new photo. The operations manager validates each notice.
What remains with the teams
The operations manager validates every notification and decides independently on follow-up actions with each provider. Only qualified technicians work on cabinets, and the agent never modifies network records.
- Field jobs inspected the same day
- Defects rectified within 30 days
- Subscribers cut off by nearby work
- Time spent sorting through photos
Provider-reported outages
When an operator reports a subscriber fault, the agent compiles the line history and recent call-outs with their photos, then suggests a probable cause.
The on-call technician confirms the cause on site.
County council reporting
Each month, the agent prepares the report on network quality and defect monitoring for the local authority.
The director reviews and signs each report.
Street cabinet remediation
The agent classifies street cabinets according to their defects and incidents to prepare the remediation programme for the year.
The operations manager finalises the programme.
Copper network decommissioning
The copper network is shutting down municipality by municipality until 2030. The agent identifies premises that still lack a fibre subscription in the relevant municipalities and prepares the information intended for town halls.
The department and the town halls decide on each information initiative.
a connection in the street cabinet in Saint-Junien, on a Tuesday in November, with a fibre routed outside its path
A connection in a street cabinet, before and after.
- Photographs
- Hundreds of technician photographs arrive and sit in a folder that no one opens.
- Each evening, the agent reviews the photographs from the day's call-outs.
- First workstream
- Substandard work
- A fibre laid outside its path goes unnoticed until a neighbour suffers an outage.
- The agent spots the off-path fibre on the after photograph.
- First workstream
- Reporting
- The notification is sent weeks later without photographs, and the operator disputes it.
- The notification is sent the following day with photographs attached, once approved by operations.
- First workstream
- Rectification
- No one checks that the defect has been rectified within the deadline.
- The agent tracks rectification through to the new photograph and flags the 30-day deadline.
- First workstream
- Subscriber outage
- The on-call technician departs without knowing the latest call-outs carried out on the line.
- The agent sends them the line history and a probable cause.
- Workstream 2
- Report to the department
- The monthly report is compiled by hand from several spreadsheets.
- The agent prepares the report using the month's audits and rectifications.
- Workstream 3
- Receive
- It receives call-out reports and their photographs submitted by operators.
- Examine
- It compares before and after photographs, in the street cabinet and in the building distribution box.
- Detect
- It spots defects against the shared inspection grid, from off-path fibres to missing labels.
- Report
- It prepares the notification for the relevant operator, with photographs attached.
- The operations manager approves each notification.
- Track rectification
- It tracks each rectification through to the new photograph and issues reminders for the 30-day deadline.
- Alert
- It flags cabinets where defects recur.
- The operations manager decides on follow-up action with the operator.
- Archive
- It files each photograph and notification into the cabinet folder.
- Report progress
- Each week, it prepares a status report on defects and their rectifications, operator by operator.
- Call-out reports
- Photographs and descriptions submitted by operators.
- Read-only
- Network information system
- Cabinets, distribution boxes, cables, and each subscriber line.
- Read-only
- Notification tool
- Defects reported to operators and their monitoring.
- Preparation, sending after approval
- Rectification schedule
- Deadlines for each rectification.
- Write
- Operations messaging
- Alerts sent to managers.
- Sending alerts
- Managing Director
- Defines the agent rules with us and selects the next workstream.
- Operations Manager
- Approves each notification and decides on next steps with each operator.
- On-call technicians
- Attend outages and work inside cabinets.
- The department
- Receives the monthly network quality report.
- FDE
- Leads the engagement and drafts the agent rules with the team. Accountable for every agent.
- Photo review agent
- Reviews the photographs from the day's call-outs each evening.
- Notification agent
- Prepares notifications and tracks rectifications.
- Reporting agent
- Prepares monthly reports for the department.
- Quality control agent
- Compares a weekly sample of assessments against technician findings and alerts the FDE to any recurring error.
- The agent reports a defect that is not genuine.
- Each notification retains its photographs, and the operations manager approves it before sending.
- A blurry photograph conceals a defect.
- The agent requests a replacement photograph from the operator as soon as an image is illegible.
- An operator disputes a notification.
- The file retains dated before and after photographs, and operations resolves the matter with the operator.
- Subscriber data leaks.
- Photographs and addresses remain within Épissure's system, and every access is logged. They remain hosted in Europe.
- The agent modifies the network.
- It has no write access to the network information system. Only technicians carry out interventions.
- We measure the baseline over one month, including audited call-outs, defects rectified within the deadline, subscribers cut off by neighbouring call-outs, and time spent on photographs. The operations manager drafts the inspection grid with us.
- The agent audits photographs alongside a technician for two weeks, and we compare its assessments with theirs.
- Each morning, the operations manager works from the notifications prepared by the agent.
- We compare against the baseline and select the next workstream with the Managing Director.
- Call-outs audited on the same day
- Share of call-outs whose photographs are reviewed that same evening.
- Defects rectified within 30 days
- Share of reported defects rectified within the deadline, compared to the baseline month.
- Subscribers cut off by nearby work
- Outages caused by work on another line, compared to the baseline month.
- Time spent sorting photographs
- Time reported by the operations team, compared to the baseline month.
Arcep, fibre optic network quality, July 2026
Arcep, broadband and superfast broadband observatory, Q2 2026