Telecommunications, six simulated engagements.
Six companies with fictional names, across Europe and the United States, from a former lift technician's business idea to a rural county fibre operator. In each simulation, AI monitors, alerts, reconciles, and prepares. Decisions remain with the teams, from breaking ground to signing off a spectrum application.
These simulations demonstrate our method on representative cases. The companies and their exchanges are fictional.
How AI is already transforming operations, from connections to customer care.
of fixed broadband subscriptions in France ran on fibre at the end of June 2026.
fibre-to-the-home coverage across the European Union as of mid-2025.
French lifts still relied on a 2G or 3G emergency call system in March 2026, out of an installed base of 650,000.
underground utility damage incidents reported in the United States in 2025, 51% of which affected telecoms and cable networks.
Since 12 November 2025, EU member state authorities must grant or refuse the permits required to deploy very high capacity networks within four months. In the absence of a response within this deadline, the permit is in principle deemed granted, unless the member state has established an alternative right of appeal.
Six companies, six starting points.
An operator running a rural county's public fibre network, discovering connection defects only when subscribers lose service.
Every connection inspected that evening, supported by photographic evidence.
- Épissure operates the public fibre-optic network and its approximately one hundred thousand connections on behalf of a rural French county. Based in Limoges, the business employs one hundred and twenty staff. Subscriber connections are handled by technicians from retail service providers, who frequently rely on subcontractors.
- At the end of June 2026, 85% of fixed internet subscriptions in France were delivered via fibre. Every new Épissure subscriber is connected by a technician from their chosen provider, working directly inside street distribution cabinets.
- Technicians submit photos of each job, but no one has the time to review them. A cable poorly routed in a cabinet can disconnect a neighbouring subscriber weeks down the line. Regulatory authority Arcep tracks the proportion of defects rectified within 30 days, which reached 88% in February 2026 across all retail operators.
- Every evening, an agent reviews before-and-after photos of the day's field work on street cabinets and building termination boxes. It identifies misplaced fibres, missing labels, omitted protective caps, and enclosures left open.
- For each defect, it drafts an incident report for the relevant operator with photos attached, tracking the remediation through to the submission of a new photo. The operations manager validates each notice.
What remains with the teams
The operations manager validates every notification and decides independently on follow-up actions with each provider. Only qualified technicians work on cabinets, and the agent never modifies network records.
- Field jobs inspected the same day
- Defects rectified within 30 days
- Subscribers cut off by nearby work
- Time spent sorting through photos
A rural ISP whose switchboard is overwhelmed during every winter storm as hundreds of subscribers call about the same outage.
Every outage explained to subscribers before their first call.
- Fencewire delivers broadband access to fourteen thousand homes and businesses across western Montana valleys, deploying fibre in townships and fixed wireless links from high-altitude relay towers. The Missoula-based firm employs sixty staff, including a nine-person customer service team.
- When a snowstorm cuts power to a relay site, hundreds of subscribers lose their connection simultaneously. The switchboard becomes flooded, and advisers spend the day repeating the same explanation. Meanwhile, field engineers only discover the full scale of the fault through incoming calls.
- American internet service providers must file broadband deployment data with the FCC biannually, on 1 March and 1 September, on a location-by-location basis. The federal programme assisting low-income households with broadband bills ended on 1 June 2024, prompting many Fencewire subscribers to alter their plans.
- An agent monitors network alerts around the clock. When a relay goes offline, it identifies the affected subscribers and alerts the on-call engineer, including the probable cause.
- It prepares notifications for subscribers enrolled in service alerts and updates the chat interface with the latest incident status. The network engineer reviews and signs off every message before dispatch.
What remains with the teams
The network engineer directs all remediation work and signs off every customer communication. Customer support retains sole authority over goodwill concessions, and the compliance officer certifies every FCC filing.
- Subscribers notified before their first call
- Inbound calls logged during an outage
- Time from alert to engineer dispatch
- Corrections requested on FCC filings
An integrator managing lines and connections across two thousand retail stores and hotels, whose asset inventory fell out of sync with supplier invoices after copper switch-off.
Every billed circuit reconciled with its physical site and hardware.
- Clavija manages connectivity for retail and hotel chains across Spain, handling everything from broadband access to cellular lines for payment terminals and alarm systems. Based in Barcelona, the firm employs eighty-five staff and oversees roughly two thousand sites for around forty corporate clients.
- On 27 May 2025, the Spanish incumbent operator permanently closed its remaining 661 copper exchanges. Clavija's client premises migrated to new connections within months, and asset inventories were never properly updated.
- Every month, invoices from multiple carriers arrive listing thousands of circuits, many no longer matching any operational site. Furthermore, critical payment terminals and alarms still rely on 3G, even though one of the country's national 3G networks is slated to shut down by 31 December 2027.
- An agent ingests billing files, operator portal exports, contracts, and field reports to compile a single, unified inventory site by site.
- It reconciles every billed line against its assigned premises and terminal, flagging dormant connections. It also pinpoints remaining legacy 3G devices. The account manager validates each recommendation before presenting it to the client.
What remains with the teams and clients
The client retains sole authority to cancel a line, and the account manager validates all reconciliation findings. Field engineers handle physical terminal replacements, while the agent never orders or cancels services directly with any carrier.
- Billed lines matched to an active site
- Dormant lines flagged for cancellation
- Legacy 3G devices catalogued
- Time spent reviewing monthly invoices
An emerging contractor building open-access fibre networks, juggling hundreds of weekly underground utility location requests.
Not a shovel in the ground without a valid utility locate and permit.
- Wirechief was founded by a former cable operator construction superintendent and a network engineer. Based in Raleigh, the business deploys fibre infrastructure across mid-sized North Carolina cities, opening networks to multiple service providers. It employs twenty-six staff and directs subcontracted civil excavation crews.
- Before breaking ground, excavation crews must submit a locate request to the state 811 centre at least three full business days in advance. Underground asset owners then mark their buried lines, with tickets remaining valid for 28 calendar days.
- Across the United States in 2025, 221,717 incidents of damage to underground facilities were reported, with telecoms and cable lines accounting for 51%. At Wirechief, locate tickets and right-of-way permits were tracked across disparate spreadsheets, leading crews occasionally to dig under expired tickets.
- An agent drafts locate tickets directly from crew scheduling data three full working days before excavation begins, confirming that the municipal work permit is already secured. The construction supervisor officially submits each ticket.
- It monitors responses from all utility operators and alerts the supervisor if any markings are missing or if a ticket is approaching expiration.
What remains with the teams
The construction supervisor holds sole discretion to clear crews for digging after visually inspecting ground markings on site. Only utility asset owners mark their lines, and the agent never authorises excavation work.
- Worksites started with valid utility locates
- Tickets expired during active excavation
- Utility strikes on existing networks
- Time spent managing 811 locate tickets
A startup deploying private 5G networks across industrial hubs, where RF engineers spend weeks preparing every spectrum licence application.
Every spectrum licence application complete on the very first submission.
- Peilung was established by two former mobile network radio engineers. Based in Hamburg, the firm designs and operates private 5G networks for container terminals and logistics warehouses, where autonomous vehicles and sensor arrays demand industrial-grade reliability. It employs twenty-two staff, including nine RF engineers.
- In Germany, the Federal Network Agency assigns local 5G frequencies in the 3.7 to 3.8 GHz band upon application by property owners or authorised site operators. By November 2025, it had logged 484 applications and granted 484 allocations.
- Every filing requires comprehensive site schematics, exact spatial coordinates, projected transmission power, and detailed antenna specifications. Clients then demand radio propagation reports validating promised coverage, which RF engineers assemble manually between field deployments.
- An agent drafts the complete regulatory filing from site blueprints and proposed radio designs, verifying that all mandatory exhibits and technical details are present.
- Following field drive tests, it compiles raw survey data into a structured zone-by-zone coverage report, automatically highlighting weak spots. The RF engineer reviews and signs off every regulatory file and technical report.
What remains with the engineers and clients
The RF engineer signs off every regulatory application and sets all antenna tuning parameters. The client chooses which facility zones to cover, and the agent never modifies network configuration settings.
- Filings accepted on first submission
- Application preparation time
- Time from RF survey to final report
- Coverage dead zones resolved before sign-off
A former lift technician preparing to help property owners audit their critical safety lines ahead of legacy network sunsets, starting with zero clients.
A service offering tested with simulated landlords and property managers before the first meeting.
- Jarretière is a venture launched by a former lift technician based in the Nantes area. She aims to offer commercial and residential property owners a comprehensive audit of all safety-critical lines, from lift emergency diallers to car park call points, backed by a circuit-by-circuit migration plan.
- The French public copper telephone network is closing municipality by municipality up to 2030, while 2G and 3G networks are progressively switched off between 2026 and 2029. According to industry trade bodies, nearly 290,000 out of France's 650,000 lifts still rely on 2G or 3G emergency lines.
- A decree enacted on 4 March 2026 mandates lift maintenance providers to notify owners whose systems are vulnerable to network shutdowns, strengthening statutory technical inspections from 15 May 2026. Across commercial and residential properties, secondary safety lines rarely have a clear designated owner. For now, the venture exists only as an idea and an address book.
- Within days, the concept was turned into an online demonstration featuring a simulated audit of a one-hundred-unit residential complex. Before any sales meetings, the service offering was tested with a panel of simulated buyers representing property managers, social housing landlords, senior living operators, and lift contractors.
- The panel raised two objections. Lift maintenance firms already cover emergency diallers under their maintenance contracts, while residential managing agents must put unbudgeted expenses to a vote at a general meeting. The service offering was refocused on social housing providers, with an audit of all other safety lines and a pilot at one residential complex.
What remains with the founder
Simulated buyers never sign contracts; proof of market demand requires a paid pilot with an actual landlord. Lift companies retain control of emergency phone maintenance, and building owners decide on every hardware upgrade.
- Offer iterations tested against the buyer panel
- Landlord meetings secured
- Paid pilot engagements signed
- Circuits audited during the pilot
Every sales call prepared, then analysed by AI
No case study has been published for this sector yet. The APPELIA case study details how every sales call is prepared, then analysed using AI. It is categorised under Technology and innovation.