Peilung, the full simulation.
A startup deploying private 5G networks across industrial hubs, where RF engineers spend weeks preparing every spectrum licence application. The case followed on this page, the frequency application for the East terminal of a port client in Hamburg, with the owner's consent still awaited.
A startup deploying private 5G networks across industrial hubs, where RF engineers spend weeks preparing every spectrum licence application.
Every spectrum licence application complete on the very first submission.
- Peilung was established by two former mobile network radio engineers. Based in Hamburg, the firm designs and operates private 5G networks for container terminals and logistics warehouses, where autonomous vehicles and sensor arrays demand industrial-grade reliability. It employs twenty-two staff, including nine RF engineers.
- In Germany, the Federal Network Agency assigns local 5G frequencies in the 3.7 to 3.8 GHz band upon application by property owners or authorised site operators. By November 2025, it had logged 484 applications and granted 484 allocations.
- Every filing requires comprehensive site schematics, exact spatial coordinates, projected transmission power, and detailed antenna specifications. Clients then demand radio propagation reports validating promised coverage, which RF engineers assemble manually between field deployments.
- An agent drafts the complete regulatory filing from site blueprints and proposed radio designs, verifying that all mandatory exhibits and technical details are present.
- Following field drive tests, it compiles raw survey data into a structured zone-by-zone coverage report, automatically highlighting weak spots. The RF engineer reviews and signs off every regulatory file and technical report.
What remains with the engineers and clients
The RF engineer signs off every regulatory application and sets all antenna tuning parameters. The client chooses which facility zones to cover, and the agent never modifies network configuration settings.
- Filings accepted on first submission
- Application preparation time
- Time from RF survey to final report
- Coverage dead zones resolved before sign-off
Operational network monitoring
The agent monitors the metrics for each network and prepares an incident report for the client when an area degrades.
The operations engineer decides on each intervention.
RFP response drafting
The agent identifies requirements from port and logistics specifications, then prepares the tender response.
The founders decide whether to bid and set the price.
Hazardous industrial zones
For each site, the agent collates the client's requirements for explosion-hazard zones and verifies that all planned equipment is authorised for use there.
The client's safety manager validates each installation.
Firmware and hardware updates
The agent tracks updates published by manufacturers and prepares the intervention schedule for each site.
The operations engineer schedules each update with the client.
the frequency application for the East terminal of a port client in Hamburg, with the owner's consent still awaited
A frequency application for a port terminal, before and after.
- Site plan
- The radio engineer copies the site boundaries manually from the client's plans.
- The agent calculates the coordinates of the area from the plans.
- First workstream
- Documents
- The owner's consent is missing, and no one notices before submission.
- The agent flags the missing document as soon as the file is opened.
- First workstream
- Neighbours
- A neighbouring site is already using the band, and the application is returned.
- The agent identifies neighbouring sites to notify before submission.
- First workstream
- Measurement report
- Survey readings wait for weeks before being turned into a report.
- The agent compiles the coverage report within the week, area by area.
- First workstream
- The incident
- The client reports a degraded area, and the team sifts through the metrics.
- The agent prepares the incident report with the metrics for the area.
- Workstream 2
- The tender
- The founders review hundred-page specifications on their own.
- The agent identifies the requirements and prepares the response file.
- Workstream 3
- Receive
- It receives the site plans and the network design.
- Calculate the area
- It calculates the coordinates of the area to be covered.
- The radio engineer checks the area.
- Assemble the application
- It compiles the documents for the frequency application.
- Verify
- It checks that no documents are missing and identifies neighbouring sites to notify.
- Prepare submission
- It prepares the complete application for the Federal Network Agency.
- The radio engineer signs and submits each application.
- Receive measurements
- It receives the readings from each measurement campaign.
- Draft the report
- It compiles the coverage report, area by area, highlighting weak spots.
- The radio engineer reviews and signs each report.
- Archive
- It keeps every version of the application and the report.
- Client plans
- Site and building plans.
- Read-only
- Radio planning tool
- Network design and planned antennas.
- Read-only
- Frequency application
- Supporting documents for each application.
- Preparation, signature by the radio engineer
- Measurement readings
- Measurements from each campaign.
- Read-only
- Network monitoring
- Metrics for live networks.
- Read-only
- The founders
- Set the agent's rules with us and choose the next workstream.
- The radio engineers
- Sign each frequency application and each report.
- Clients
- Select the areas to cover and sign off on acceptance.
- Client safety managers
- Approve each installation on their site.
- The FDE
- Leads the engagement and writes the agent's rules with the team. They are accountable for each agent.
- Applications Agent
- Prepares frequency applications.
- Measurements Agent
- Compiles coverage reports.
- Operations Agent
- Monitors live networks and prepares incident reports.
- Audit Agent
- Compares a weekly sample of applications against engineers' corrections and alerts the FDE to any recurring errors.
- An incorrect coordinate enters an application.
- Each coordinate links back to the original plan, and the radio engineer checks the area before signing.
- The report conceals a weak spot.
- Every measurement remains visible in the report, and the radio engineer reviews each area.
- The agent changes a setting.
- It has no write access to equipment. Only engineers adjust antennas.
- A client's plans are leaked.
- Each client has a dedicated workspace, and every access is logged. Data remains hosted in Europe.
- Unauthorised equipment enters a hazardous area.
- The agent checks all planned equipment, and the client's safety manager approves each installation.
- We measure the baseline over one month, such as application preparation time, applications returned incomplete, the turnaround time for measurement reports, and weak spots discovered during acceptance. The radio engineers define the list of required documents with us.
- The agent prepares two applications in parallel with the engineers, and we compare its documents with theirs.
- The engineers work from the agent's applications and reports for all new sites.
- We compare against the baseline and decide on the next workstream with the founders.
- Applications complete on first submission
- Share of applications accepted without requests for additional information.
- Application preparation time
- Time reported by radio engineers, compared to the baseline month.
- Turnaround time from measurements to report
- Time elapsed between the end of the campaign and report submission.
- Weak spots resolved before acceptance
- Weak spots flagged in the report and corrected before client acceptance.
Federal Network Agency, local frequency assignments, Nov. 2025